Doka GmbH

Planning

Between the decision and the finished system lie sizing, applications and deadlines. We take care of this part. You sign, we organise.

What planning includes

Sizing

We determine the number of modules, their layout and the inverter so that yield and self-consumption match.

Shading

Trees, chimneys, neighbouring buildings: we check how shadows move and choose the wiring accordingly.

Roof and structure

We assess the roof covering and load reserves and choose the suitable mounting system.

Connection application

We submit the technical connection application to the grid operator for you and handle any follow-up questions.

Permits

Notification or building permit, depending on the municipality and the building. We know what your case requires.

Subsidies

We register the one-off subsidy and other contributions so that nothing is lost.

What you receive from us

  • A system diagram with the module layout on your roof
  • A yield estimate for your location
  • A quote with all items, without hidden extra costs
  • A realistic schedule up to commissioning
  • Registration with the grid operator and the subsidy office
  • A fixed contact person throughout the project

Request a quote

Name and phone number are enough. We usually get back to you within one working day.

Address
Herrenmattstrasse 5
3175 Flamatt

Free quote in one minute

Three details are enough. We sort out the rest by phone.

* Required field. We need your e-mail or phone number to be able to reply.